1. Electric power supply: Already built up Yinhu, Gaoqiao and Baihe, three transformer substations of 110,000 volts, power supply capacity is 300,000 kilowatts. The electric power supply is abundance and reliable.
2. Water supply: Fuyang No.2 waterworks produces water daily 100,000 ton, and his water supply projects already been put into operation, supplying water to the developing zone directly.
3. Communication: Have formed mathematics, optical cable, microwave transmission, mobile communication as the mainly communication network in the district, is 30,000 exchanges capacity of assembly program-controlled office in newly-built Fuchunwan
4. Already built up Golf way whose width is 48 meters as the axis, and the traffic network of No.320 national highways and Hang Fu riverine highways as both wings in the district.
5. Sewage treatment: Build up the sewage treatment plant in the district, deals with 20,000 tons of sewages daily, and lay special-purpose blowdown, entering into the blowdown system directly.